The Acquisition Management Systems and Tools team is set to launch the latest update to the Procurement Management Tool (PMT), known as v.5.0, on Dec 21. PMT users can expect the site to be temporally disabled at 8 p.m., Dec. 17

dcmilitary.com offers audio versions of articles using Instaread. Some words may be mispronounced.

The Acquisition Management Systems and Tools team is set to launch the latest update to the Procurement Management Tool (PMT), known as v.5.0, on Dec 21. PMT users can expect the site to be temporally disabled at 8 p.m., Dec. 17.

Version 5.0 was redesigned with the user in mind, explained Tom Spidel, director for AIR 1.7.

“From the first version of PMT to today, the intention of the tool has always been to improve and standardized procurement management processes for IPT leads, contract specialist and leadership personnel across NAVAIR,” Spidel said. “Our customers will be pleased to learn that v.5.0 has features that reduce risk and forecast future workloads more accurately.”


In November, v.5.0 was previewed at Patuxent River, Maryland; Lakehurst, New Jersey and Orlando, Florida to enable users to become familiar with some of its new features.

“As the PID Manager for NAWCTSD, I have a different perspective regarding the usage of the Procurement Management Tool,” said Lori Evans-Lancaster. “With that being said, I love the overall look. It is a much more muted and inviting. For example, the color scheme (black, blue-gray, and gold) is very visually appealing.”

For Evans-Lancaster, a refreshing change to the tool is the elimination of the P1-P7 categories. This feature was replaced with questions to categorize the Procurement Initiation Document’s workflow into four categories.

These categories include:

- Releasing RFP

- Not Releasing RFP

- Simplified Acquisition

- External Action (This would include Military Interdepartmental Purchase Requests, commonly known as MIPRs.)

“This is a wonderful change, she said. “There was so much confusion about which category a specific PID was. Additionally, having the default milestones match the procurement is a huge feature. The simplification of having four categories is brilliant. We did not have this option before. Now new data elements are required at the on-set of the PID creation, but this will prevent of heart burn later on in the process.”

Another example of how v.5.0 was designed with PMT users in mind is the ability to open the Permission Management and Manage Milestone pages from the navigation bar.

The Milestone Summary Page has been improved by eliminating timeouts, added a smart calendar, which tracks your last date entry as well as the ability to enter a duration to auto populate a start or end date.

“I believe everyone is going to be thrilled with the calendar duration capability,” Evans-Lancaster said. Additionally, Revise Milestone will provide the ability to adjust multiple milestones and notifies appropriate users that milestones have been changed. According to Ms. Evans-Lancaster “This will convert all the milestones if there is indeed a slip, or if the milestones are ahead of schedule — even in the active status.”

She explained this feature has the potential to save staff and supervisors many hours in adjusting and creating records to either add or delete an additional milestone.

In addition to PMT, the Acquisition Management Systems and Tools (AIR 1.7) team designs and maintain software to support NAVAIR programs and competencies with naval aviation procurements: the Common Spend Plan Tool (CSPT), the Contract Deliverables Requirements List (CDRL) tool; and the Acquisition Plan (AP) tool.