Search
Filter Search
Update Results
  1. 53K testing to the extreme
    53K testing to the extreme
    LocalNAWCAD Prototyping Instrumentation and Experimentation (PIE) Department and Atlantic Test Ranges (ATR) personnel and members of the CH-53K Integrated Test Team (ITT) traveled to the McKinley Climatic Chamber at Eglin Air Force Base (AFB), Florida, to support several months of hot- and cold-weather testing on the King Stallion heavy-lift helicopter. Aircraft testing included environmental systems as well as aircraft startup, operation, blade fold, and landing gear operation. Shelly Stuller Gray Graphics and Communications Specialist, Prototyping Instrumentation & Experimentation Department, and Theresa Hopkins, Senior Writer/Editor, Atlantic Ranges & Targets Department 3 Min Read
  2. ATR builds own threat emitter for NGJ and Growler testing
    ATR builds own threat emitter for NGJ and Growler testing
    Tenant Profilefeatured NAWCAD’s Atlantic Test Ranges (ATR) has designed and built a mobile adversary radar simulator from commercial components, primarily for testing the Navy’s EA-18G Growler and Next Generation Jammer, but with variants also available for other military weapon systems. There’s even a low-cost disposable version for Army target practice that rotates the unit with a pizza turntable. By Robert Kaper Senior Technical Writer Atlantic Test Ranges 1 Min Read
  3. Pax River, ATR receive $3 million grant for Eastern Shore land protection
    Pax River, ATR receive $3 million grant for Eastern Shore land protection
    Localfeatured The Atlantic Test Ranges (ATR) and NAS Patuxent River have been awarded a $3 million grant from the Department of Defense (DoD)’s Readiness and Environmental Protection Integration (REPI) Program to protect land on Maryland’s Eastern Shore. By Matt Kane The Nature Conservancy Special to Tester 2 Min Read
  4. Mobile Integrated Telemetry System
    Mobile Integrated Telemetry System
    Tenant ProfileA Mobile Integrated Telemetry System (MITS-12) is craned aboard USS America (LHA 6) pier-side in San Diego in October during preparations for the third and final developmental test period (DT-III) for the F-35B Lightning II program. 1 Min Read

Guest

Dashboard Manage Account Log out