Project: Bridge 15 Replacement
Road/Intersection Affected: Bauer Road
Work Being Performed: Selective demolition of the bridge over Chopowamasic Creek
Traffic Affects:
- Bridge closures at night during demolition operations
- Will require alternate/emergency access coordination
Estimated Start Date: Mid-late December
Estimated End Date: Early January
Project: OCS & MCAF Water Line Replacement
Road/Intersection Affected: Bauer Road
Work Being Performed: Steam line demolition and replacement of water main.
Traffic Affects:
- Shift of traffic lanes
- Reduced speed on Bauer Road
- Intermittent lane closure to permit underground valve/piping tie ins
- Single lane conditions during paving operations
Estimated Start Date: ongoing
Estimated End Date: Mid-January
Project: Marine Security Group BEQ
Road/Intersection Affected: MCB-4
Work Being Performed: Sanitary sewer line installation.
Traffic Affects:
- One lane will be closed at a time for construction
- Traffic control measures via signs and flagperson
Estimated Start Date: Mid-November
Estimated End Date: late November
Project: BRAC Collocate Military Department Investigative Agencies
Road/Intersection Affected: Russell Road and I-95 interchange
- Traffic shifts
- Flagpersons will direct traffic
Work Being Performed: Expansion of Russell Road and I-95 interchange
Estimated Start Date: Mid-November
Estimated End Date: March
Project: ASP Road Repairs/Road and Drainage Improvements
Road/Intersection Affected: ASP Compound
Work Being Performed: Road widening, addition of shoulders, repaving work, road repair
Traffic Affects: Road will be open for ASP traffic
Estimated Start Date: November
Estimated End Date: Late February
Project: Russell Road Infrastructure Phase 1 (P-479)
Road/Intersection Affected: Russell Road from Route 1 overpass (outside of gate) to Marine Corps Credit Union, including significant expansion to the Entry Control Point.
Work Being Performed: Site surveys and exploratory drillings, construction laydown area access (directly west of Route 1 overpass),
excavation and grading.
Traffic Affects: Increased distractions to drivers due to activity of survey and site layout crews, and mobilization of equipment to site
Estimated Start Date: Early December
Estimated End Date: Late September 2010
Project: Construct Parking Lot Behind Bldg. 709 and 710
Road/Intersection Affected: Broadway between underpass and
Gate #3.
Work Being Performed: Parking lot asphalt
Traffic Affects:
- Intermittent single lane closures
- Daytime work only
Traffic control measures via signs and signal flagperson
Estimated Start Date: Mid-November
Estimated End Date: Early December
Project: Repair Building 2006
Road/Intersection Affected: Hawkins Avenue and parking lot by
Bldg. 1999
Work Being Performed: Parking restrictions per Base Fire order due to temporary trailer setup.
Traffic Affects:
- Parking along Hawkins Avenue north of Bldg. 2000 (Mess Hall). Traffic traveling along Hawkins Avenue is still allowed. Trailers in parking lot by Bldg. 1999
Estimated Start Date: November 2009
Estimated End Date: December 2010
Project: Various Pothole repairs
Road/Intersection Affected: Broadway Avenue next to Bldg. 3076 and Barnett Avenue next to P.M.O.
Traffic Affects:
- Single lane closures in the vicinity of the repairs
- Work will be performed during the daytime during non-rush hours
Estimated Start Date: Mid-November
Estimated End Date: Late November